You are here: Use Enterprise Timetabler > Scheduling > Schedule an activity > Change the duration of a scheduled activity

Change the duration of a scheduled activity

You can lengthen or shorten a scheduled activity. The allocation of resources to the activity is unaffected.

To change the duration of an activity, follow these steps:

  1. In the table in the Activities pane, select the activity that you want to modify.
  2. In the timetable area, drag the end of the activity to a new end time.

A dotted line indicates the latest end time that you can drag to.

Result: The activity duration changes. As a result, the number of blue diamonds that indicate other valid start times for the activity might change in number.


Copyright © Scientia Ltd. 2016